Excellence in Project Delivery.
Project Portfolio
Shiploader Upgrade
Replacement of ship unloader control system, including the installation of hopper/spill plate and dust mitigation system.
All Weather Loading Study
For this all weather scoping study, Sacré-Davey designed a system to allow loading during all weather conditions at the port.
Canola Glycol Transfer & Storage
Sacré-Davey provided the feasibility study and cost estimate for new integrated railcar unloading, transfer and storage system for glycol.
Potash Handling Study
Sacré-Davey completed a high-level capital cost estimate to upgrade an existing potach receiving, storage, and shipping facility.
Zinc Load & Unload Project
Sacré-Davey provided full detailed engineering for a truck and a rail loading facility to receive, stockpile and ship zinc concentrate.
Univar MEG Expansion
Sacré-Davey provided design and commissioning services for a glycol rail-unloading, storage, and shiploading expansion project.
Zero Liquid Discharge
SD prepared a study and capital cost estimate for a water treatment system to capture and recover the boiler water treatment system.
Reclaim Barge Conditional Assessment
We performed a conditional assessment on two reclaim barges for both short and long-term viability.
Design Review of Natural Gas Pipeline
SD provided a design review, stress analysis, and design input for a pipeline for the new Kwoen Gas Plant in Northern BC.
Piping Integrity Assessment
SDE completed an integrity assessment on steam, condensate, chloride, brine, and slurry piping systems within the process plant.
Reverse Osmosis Demineralization Replacement
Our scope of work was to integrate our clients in-situ separate train demineralizer water system that fed three separate boilers.
65 MW Cogeneration Turbine
Our team developed a preliminary process design and cost estimate for a 65MW cogeneration turbine for a pulp & paper client.
Steam Supply Upgrade
Sacré-Davey provided services for the replacement of an older fire tubed boilers with state-of-the-art steam generators.
Conveyer Line
This project involved integrating new feed conveyors and a new palletizer into an existing bottling line.
Bakery Decommission
This project involved decommissioning of the manufacturing plant and distribution center, and building repairs and modifications.
Building Expansion & New Production Line
Sacré-Davey provided engineering and project management services for the enlargement of a 77,000 sq. ft. commercial bakery.
Mt. Milligan Project
We provided the feasibility study and detailed engineering for a brownfield rail car unloading project for copper concentrate.
No. 2 Paper Machine Fourdrinier Table Rebuild
This project includes the detailed design for the No. 2 paper machine fourdrinier table rebuild at Port Townsend Paper.
Dough Mixers Overhaul and Glycol Conversion
We worked on the design and installation of a new glycol system and the overhaul of the 2500lb bread dough mixers.