Shiploader Upgrade
Project Description:
For this Ship Unloader upgrade project, Sacré-Davey had to replace the obsolete electrical drive control system of the Berth #1 Ship Unloader. This system upgrade also included the installation of a receiving hopper/spill plate, the addition of efficient dust mitigation measures for the hopper, and the replacement of other worn-out components of the ship unloader as required.
Project Solutions:
Designed an innovative proprietary solution including conveyors, tripper, shiploader and cover.
Project Achievements:
Replacement of the hopper was seamless with no delays for the barge or crane.