Shiploader Upgrade

Project Description:

For this Ship Unloader upgrade project, Sacré-Davey had to replace the obsolete electrical drive control system of the Berth #1 Ship Unloader. This system upgrade also included the installation of a receiving hopper/spill plate, the addition of efficient dust mitigation measures for the hopper, and the replacement of other worn-out components of the ship unloader as required.

 
 

Project Solutions:

Designed an innovative proprietary solution including conveyors, tripper, shiploader and cover.

Project Achievements:

Replacement of the hopper was seamless with no delays for the barge or crane.