Reclaim Barge Conditional Assessment

Project Description

Our client had concerns of two reclaim barges at their tailings pond site for both short and long-term viability. Sacré-Davey conducted NDT, visual inspections, a pump performance assessment and an investigation of the equipment’s historical and operational information. The report allowed the client to make decisions with respect to Capex planning.

 
 
Previous
Previous

Design Review of Natural Gas Pipeline

Next
Next

Zero Liquid Discharge