65 MW Cogeneration Turbine
Our pulp and paper client identified an opportunity to optimize steam resources and increase revenue by installing a 65 MW condensing steam turbine/generator set. Mill-wide steam consumption was reviewed and maximum efficiency gained by converting several turbine drives to electric; optimizing steam generating boilers; and installing the turbine generator & associated equipment.
Reverse Osmosis Demineralization Replacement
Port Townsend Paper had an in-situ separate train demineralizer water system feeding three separate boilers. Sacre-Davey’s primary scope of work was integration of these units within the mill and detailed design for ancillary system requirements.
No. 2 Paper Machine Fourdrinier Table Rebuild
This project includes the detailed design for the No. 2 paper machine fourdrinier table rebuild at Port Townsend Paper. Sacré-Davey staff reviewed the documentation provided by the technology provider, IBS, and integrated the system requirements within the mill. We provided a scope of work construction package that described and detailed the multidisciplinary work and specific requirements for contractor installation.
Project Portfolio .
Project Portfolio .
From groundbreaking engineering solutions in renewable energy to optimizing complex industrial processes, SD’s portfolio showcases a commitment to excellence and a greener future.
Client
Varennes Carbon Recycling
Year
Present
Project
Green Hydrogen Facility
Sector
Energy
In the development of an 87-megawatt electrolyzer plant generating 11,100 tons per year of green hydrogen and oxygen for supply to Énerkem's biofuel production facility, Accelera by Cummins was chosen as the PEM electrolyzer. Sacré-Davey, leveraging its extensive history in the hydrogen market, was engaged to deliver Owner’s Engineering Services. This encompassed electrolyzer selection, integration, and guidance on balance of plant design for the facility. Following the Phase 1 contract completion, a performance appraisal rated Sacré-Davey's services as "Exceptional," achieving a commendable 95% rating.
Client
ReGen III
Year
2022
Project
Decarbonization & Renewable Oil Refinery
Sector
Energy
Sacré-Davey received the FEED (Front-End Engineering Design) contract for a 5600BPD re-refinery. The project integrates established refining technologies into a proprietary process, enabling the extraction of higher quality base lubricating oils compared to conventional re-refineries. Positioned to meet the growing demand for efficient used motor oil re-refining and aligning with the emphasis on reducing carbon dioxide equivalent emissions, this facility represents a significant step in resource conservation. Sacré-Davey successfully delivered the front-end engineering scope within a best-in-class schedule, meeting the requirements of both investors and clients.
Client
Agnico Eagle | Pinos Altos Mine
Year
2019
Project
Ore Sorting Evaluation & Demonstration Plant
Sector
Mining & Minerals
Sacré-Davey took charge of conducting testing and assessing diverse technologies, utilizing samples sourced from different mines. The goal was to identify the technology that could deliver the most significant overall impact on the project's economics. Subsequently, Sacré-Davey offered integration engineering services for the construction of a demonstration plant at Agnico Eagle’s Pinos Altos mine. The plan included the installation of two additional plants by 2020.
Client
Confidential
Year
2023
Project
Green Fuel Feasibility Study
Sector
Energy
A European-based client, operating in shipping, energy, technology, and real estate, is exploring Canada as a prospective location for their green fuels plant. The feasibility assessment undertaken had several objectives: 1) Evaluate the availability of appropriate biomass sources, 2) Examine potential plant sites, 3) Offer an economic analysis to substantiate investment decisions, 4) Identify counterparties and potential partners, and 5) Assess the regulatory landscape.
Client
Pembina, Vancouver Wharves
Year
2020
Project
Diesel Tank EPC & detailed CapEx estimate
Sector
Ports & Marine
In the Procurement and Construction phases of the North Vancouver Terminal diesel tank project, Sacré-Davey undertook the construction of two diesel fuel tanks, with nominal capacities of 80,000 and 120,000 barrels respectively. The project involved a meticulous review and development of the Engineering, Procurement, and Construction (EPC) project schedule, along with a detailed Capital Expenditure (CapEx) estimate following AACE principles.
Client
The University of British Columbia
Year
2022
Project
Decarbonization & Energy Infrastructure
Sector
Energy
Sacré-Davey successfully executed multiple energy infrastructure projects for UBC, encompassing the development of their (1) bioenergy plant, (2) expansion of the biomass hot water plant, and (3) enhancement of the steam distribution plant. These energy infrastructure initiatives spanned a university campus, strategically aimed at enhancing operational efficiency and energy performance within buildings of various ages.
Client
Plains Midstream Energy Company
Project
Oil & Gas Cogeneration Study
Sector
Energy
Sacré-Davey conducted a cogeneration scoping study for on-site electric generation at Natural Gas Liquids extraction plants. With an annual electricity cost exceeding $10 million, the challenge was unevenly balanced electric and steam demands, fluctuating capacities, and regulatory restrictions. Sacré-Davey proposed an innovative solution optimizing electricity and steam production for the complex, achieving an estimated 20% Internal Rate of Return (IRR), surpassing the client's requirements.
Client
Tech Highland Valley Copper
Year
Present
Project
Plant Wide Audit
Sector
Mining & Minerals
Conducting a comprehensive plant-wide infrastructure audit, Sacré-Davey aims to identify risks associated with the existing infrastructure and collaborate with the client in formulating an action plan to mitigate these risks. The ultimate objective is to ensure the reliable operation of the infrastructure throughout the remaining lifespan of the mine. Currently, Sacré-Davey is actively engaged in a site-wide mechanical and structural infrastructure audit encompassing existing equipment, piping, storage tanks, grating, and structural buildings as part of routine maintenance activities.
Client
Harnois Énergies
Year
2020
Project
First Public Hydrogen Fueling Station
Sector
Energy
Sacré-Davey undertook the site integration engineering for the inaugural public hydrogen vehicle fueling station in the Province of Québec. This pioneering project incorporated on-site green hydrogen generation utilizing AWE technology, compression, and storage, seamlessly integrated with two hydrogen fuel dispensers in Québec City. The system facilitates a commercial, green hydrogen facility, covering production through the tailpipe, catering to up to 40 cars daily.
Excellence in Project Delivery