Pebble Crusher Area Improvement
Project Description
Sacré-Davey performed a study to remove the existing 350 HP pebble crushing units and replace with larger 900 HP units. In addition, a dust collection system would be installed. A new building was proposed to house the dust collection equipment. A new maintenance building was proposed which will be attached to the existing pebble crusher building and will be designed to allow the existing overhead crane to roll through. A new lube area for the new crusher lube units as well as lube storage was proposed. A new MCC building was also proposed which will be located over the new lube area.