Mining & Minerals Devon Sacre Mining & Minerals Devon Sacre

Scoping Study

SDE worked to produce a comprehensive scoping study for the optimization and development of a new mine. SDE’s responsibilities included all onsite facilities including the mill building (from the Crusher to the Concentrate Load-out), offices, maintenance shops, stores, camp, water & wastewater treatment, and transportation of tailings.

Read More
Mining & Minerals Devon Sacre Mining & Minerals Devon Sacre

Pilot Plant Design

This project was for a large open pit Zn mine located in an extremely cold weather environment in the USA. Sacré-Davey Engineering was tasked with identifying suitable sorting techniques, carrying out the option evaluation and performing detailed engineering of the sorting plant.

Read More
Mining & Minerals Devon Sacre Mining & Minerals Devon Sacre

Sabina Gold & Silver: Feasibility Study & Detailed Design

Sacré-Davey Engineering assisted Sabina Gold & Silver with managing and compiling their updated feasibility study for their Goose Project, Sabina’s first planned mine in Sabina’s Back River Gold District. Sacré-Davey managed the compiling of data and information from contributing companies for each of the 28 sections. Alongside its management role, Sacré-Davey worked on and contributed to the following sections: Onsight infrastructure, Logistics, Capital cost estimates, operating cost estimates, and the financial analysis.

Read More
Mining & Minerals Devon Sacre Mining & Minerals Devon Sacre

EPCM of Ore Sorting Plant

The acid-generating stockpiles and the distance between the mine and the mill was not only expensive, but also very difficult to manage at the Bonanza Ledge Gold Mine. An opportunity was identified to sort the sulfides carrying gold, and only ship the high-quality material at a very low cost. Sacré-Davey Engineering was responsible for the detailed engineering, procurement support, and construction management of an XRT sorter at the Bonanza Ledge Gold mine.

Read More

Project Portfolio .

Project Portfolio .

From groundbreaking engineering solutions in renewable energy to optimizing complex industrial processes, SD’s portfolio showcases a commitment to excellence and a greener future.

Client
Varennes Carbon Recycling

Year
Present

Project
Green Hydrogen Facility

Sector
Energy

In the development of an 87-megawatt electrolyzer plant generating 11,100 tons per year of green hydrogen and oxygen for supply to Énerkem's biofuel production facility, Accelera by Cummins was chosen as the PEM electrolyzer. Sacré-Davey, leveraging its extensive history in the hydrogen market, was engaged to deliver Owner’s Engineering Services. This encompassed electrolyzer selection, integration, and guidance on balance of plant design for the facility. Following the Phase 1 contract completion, a performance appraisal rated Sacré-Davey's services as "Exceptional," achieving a commendable 95% rating.

Client
ReGen III

Year

2022

Project
Decarbonization & Renewable Oil Refinery

Sector
Energy

Sacré-Davey received the FEED (Front-End Engineering Design) contract for a 5600BPD re-refinery. The project integrates established refining technologies into a proprietary process, enabling the extraction of higher quality base lubricating oils compared to conventional re-refineries. Positioned to meet the growing demand for efficient used motor oil re-refining and aligning with the emphasis on reducing carbon dioxide equivalent emissions, this facility represents a significant step in resource conservation. Sacré-Davey successfully delivered the front-end engineering scope within a best-in-class schedule, meeting the requirements of both investors and clients.

Client
Agnico Eagle | Pinos Altos Mine

Year
2019

Project
Ore Sorting Evaluation & Demonstration Plant

Sector
Mining & Minerals

Sacré-Davey took charge of conducting testing and assessing diverse technologies, utilizing samples sourced from different mines. The goal was to identify the technology that could deliver the most significant overall impact on the project's economics. Subsequently, Sacré-Davey offered integration engineering services for the construction of a demonstration plant at Agnico Eagle’s Pinos Altos mine. The plan included the installation of two additional plants by 2020.

Client
Confidential

Year
2023

Project
Green Fuel Feasibility Study

Sector
Energy

A European-based client, operating in shipping, energy, technology, and real estate, is exploring Canada as a prospective location for their green fuels plant. The feasibility assessment undertaken had several objectives: 1) Evaluate the availability of appropriate biomass sources, 2) Examine potential plant sites, 3) Offer an economic analysis to substantiate investment decisions, 4) Identify counterparties and potential partners, and 5) Assess the regulatory landscape.

Client
Pembina, Vancouver Wharves

Year
2020

Project
Diesel Tank EPC & detailed CapEx estimate

Sector
Ports & Marine

In the Procurement and Construction phases of the North Vancouver Terminal diesel tank project, Sacré-Davey undertook the construction of two diesel fuel tanks, with nominal capacities of 80,000 and 120,000 barrels respectively. The project involved a meticulous review and development of the Engineering, Procurement, and Construction (EPC) project schedule, along with a detailed Capital Expenditure (CapEx) estimate following AACE principles.

Client
The University of British Columbia

Year
2022

Project
Decarbonization & Energy Infrastructure

Sector
Energy

Sacré-Davey successfully executed multiple energy infrastructure projects for UBC, encompassing the development of their (1) bioenergy plant, (2) expansion of the biomass hot water plant, and (3) enhancement of the steam distribution plant. These energy infrastructure initiatives spanned a university campus, strategically aimed at enhancing operational efficiency and energy performance within buildings of various ages.

Client
Plains Midstream Energy Company

Project
Oil & Gas Cogeneration Study

Sector
Energy

Sacré-Davey conducted a cogeneration scoping study for on-site electric generation at Natural Gas Liquids extraction plants. With an annual electricity cost exceeding $10 million, the challenge was unevenly balanced electric and steam demands, fluctuating capacities, and regulatory restrictions. Sacré-Davey proposed an innovative solution optimizing electricity and steam production for the complex, achieving an estimated 20% Internal Rate of Return (IRR), surpassing the client's requirements.

Client
Tech Highland Valley Copper

Year
Present

Project
Plant Wide Audit

Sector
Mining & Minerals

Conducting a comprehensive plant-wide infrastructure audit, Sacré-Davey aims to identify risks associated with the existing infrastructure and collaborate with the client in formulating an action plan to mitigate these risks. The ultimate objective is to ensure the reliable operation of the infrastructure throughout the remaining lifespan of the mine. Currently, Sacré-Davey is actively engaged in a site-wide mechanical and structural infrastructure audit encompassing existing equipment, piping, storage tanks, grating, and structural buildings as part of routine maintenance activities.

Client
Harnois Énergies

Year
2020

Project
First Public Hydrogen Fueling Station

Sector
Energy

Sacré-Davey undertook the site integration engineering for the inaugural public hydrogen vehicle fueling station in the Province of Québec. This pioneering project incorporated on-site green hydrogen generation utilizing AWE technology, compression, and storage, seamlessly integrated with two hydrogen fuel dispensers in Québec City. The system facilitates a commercial, green hydrogen facility, covering production through the tailpipe, catering to up to 40 cars daily.

Excellence in Project Delivery