Zero Liquid Discharge

System to capture and recover boiler water treatment system and blow down waste as boiler feed water to eliminate liquid discharge.

SDE was contracted to prepare a study and capital cost estimate for a water treatment system. The study and engineering included a water balance for the entire facility, process and equipment selection, specification and budgetary equipment pricing for multiple equipment skids including a new building, interconnecting piping, foundations and road access.